• 03 3371 0764
  • ial_tham@yahoo.com.my

OUR COMPLETED PROJECTS

NO PROJECTS CLIENT YEAR
1 400MM PIPE LAYING - BANTING MAJU EGGAT (M) SDN BHD 2006
2 INSTALL 150MM BUTERFLY VALVE - PUCHONG SYARIKAT BINA JAYA SEPAKAT 2006
3 250MM MS PIPE LAYING – SEC.17 SHAH ALAM SYARIKAT BINA JAYA SEPAKAT 2006
4 200MM PIPE LAYING – TANJUNG MALIM, PERAK PRIMA CORRIDOR SDN BHD 2006
5 100MM PIPE LAYING DAYA SAMUDRA SDN BHD 2006
6 200MM PIPE LAYNG – SABAK BERNAM CARISSTA SDN BHD 2006
7 150MM MS PIPE – KEMAMAN, TERENGGANU PEMBINAAN ISMAIL SDN BHD 2006
8 100MM & 150MM MS PIPE – PUNCAK ALAM PEMBINAAN ISMAIL SDN BHD 2006
9 150MM MS PIPE – WANGSA MAJU PEMBINAAN JBBS SDN BHD 2006
10 PIPING ANG RELATED WORKS – JALAN SEPADU DBKL BAN LEE CONSTRUCTION 2006
11 150MM HDPE PIPE – JALAN HAJI SIRAT SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2006
12 WATER TANK KELAB SULTAN ABDUL AZIZ SHAH 2006
13 SUPPLY & INSTALL METER POINT SRI RUM PLUMBING 2006
14 TAPPING & LAYING PIPE WATER TANK - SUBANG DYNAMIC VISION ENTERPRISE 2006
15 100MM MS PIPE – SUNGAI RASAU WIDAMAN SDN BHD 2006
16 SUPPLY & INSTALL METER POINT PABW SDN BHD 2006
17 PIPE LAYING - DENGKIL PABW SDN BHD 2006
18 150MM MS PIPE (1000 METER) – TELOK GONG, KLANG VILLA TECHNO BUILD 2006
19 PIPE LAY OF 80 UNITS HOUSE - RAWANG CAP CONSTRUCTION SDN BHD 2006
20 150MM MS PIPE – SEC.32 SHAH ALAM EXCEL METRO ASSETS SDN BHD 2006
21 150MM & 500MM DIVERTING PIPE BINTANG FADRIZAL (M) SDN BHD 2007
22 GROUND WATER TUBEWELL NISSAN INDUSTRIAL OXYGEN INC 2007
23 HYDRANT PUMP SET DYNAMIC CONTROL ENGINEERING 2007
24 PEMASANGAN PRV – SECT 13. SHAH ALAM SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2007
25 PEMASANGAN PRV – BUKIT KAPAR, KLANG SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2007
26 PENGANTIAN FLOAT BALL VALVE – BUKIT LIPAT KAJANG SYARIAKT BEKALAN AIR SELANGOR SDN BHD 2007
27 100MM SCOUR VALVE – PORT KLANG SYARIKAT BEKLAAN AIR SELANGOR SDN BHD 2007
28 100MM SCOUR VALVE - KAPAR SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2007
29 I-CHANNEL PIPE 750MM - DAMANSARA SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2007
30 PEMASANGAN PRV – TAMAN MELAWIS SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2007
31 PEMASANGAN STRAINER – SECT.7. SHAH ALAM SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2007
32 PEMASANGAN INJAP KRITIKAL - KLANG SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2007
33 PEMASANGAN PRV – SECT.25, TAMAN SRI MUDA SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2007
34 PEMASANGAN & PENGGANTIAN PENUTUP KEBUK - KLANG SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2007
35 150MM & 200MM MS PIPE – BANDAR BOTANIC SEJATI PLUMBER & TGRADING 2007
36 250MM MS PIPE – NORTHPORT (M) SDN BHD MDZ CONSTRUCTION SDN BHD 2008
37 250MM HDPE PIPE – NORTHPORT (M) SDN BHD MDZ CONSTRUCTION SDN BHD 2008
38 PENANDA PAIP ABS – PORT KLANG SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2008
39 PENANDA PAIP ABS - KAPAR MERU SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2008
40 200MM ALTITUDE VALVE – BUKIT KERAYUNG SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2008
41 GREASE INTERSEPTOR SYSTEM WESTPORTS MALAYSIA SDN BHD 2008
42 REPLACEMENT OF FLOAT BALL VALVE WESTPORTS MALAYSIA SDN BHD 2008
43 HOSE REEL PIPE LINE WESTPORTS MALAYSIA SDN BHD 2008
44 150MM DUCTILE IRON PIPE WESTPORTS MALAYSIA SDN BHD 2008
45 150MM MS PIPE SIVARAJA ENTERPRISE - MARAJITU 2008
46 PEMASANGAN PRV – SUBANG BISTARI JALUR CAHAYA SDN BHD 2008
47 PEMASANGAN PRV – TERAS JERNANG JALUR CAHAYA SDN BHD 2008
48 200MM MS PIPE LAYING – KUALA SAWAH, NEGERI SEMBILAN JUA YAKIN SDN BHD 2008
49 PENGANTIAN 600MM BUTTERFLY VALVE - KEPONG MASSIVE SERVICE SDN BHD 2008
50 PEMASANGAN PRV – OLAK LEMPIT, BANTING HALUAN PRISMA SDN BHD 2008
51 PEMASANGAN PRV - BUKIT RIMAU HALUAN PRISMA SDN BHD 2008
52 MAIN TRUNK – SUNGAI PANJANG, SABAK BERNAM HALUAN PRISMA SDN BHD 2008
53 PEMASANGAN PRV – BATU 8, SIJANGKANG HALUAN PRISMA SDN BHD 2008
54 PIPE LAYING 250MM – JALAN MERU TOP GLOVE SDN BHD 2008
55 PIPE LAYING 300MM – NORTHPORT PROTAB CONSTRUCTION SDN BHD 2010
56 ALARM GONG SPRINKLE SYSTEM WESTPORTS MALAYSIA SDN BHD 2010
57 PIPE LAYING 160MM HDPE PIPE TOP GLOVE SDN BHD 2010
58 EXTERNAL WALL PAINTING AKER SOLUTIONS MALAYSIA SDN BHD 2010
59 REVAMP OF WATER TANK WESTPORTS MALAYSIA SDN BHD 2010
60 UNDERGROUND PIPE LEAKAGE WESTPORTS MALAYSIA SDN BHD 2010
61 LEAKAGE UNDERGROUND DOMESTICS MAINPIPE WESTPORTS MALAYSIA SDN BHD 2010
62 PIPE LAYING 160MM SYARIKAT BINAAN JAYA SEPAKAT 2010
63 PIPE LAYING 250MM MDZ CONSTRUCTION SDN BHD 2011
64 INTERNAL PLUMBING WORKS CCF CONSTRUCTION & TRADING SDN BHD 2011
65 LEAKAGE UNDERGROUND & HYDRANT PIPE WESTPORTS MALAYSIA SDN BHD 2011
66 PIPE LAYING 250MM AS GLOBAL RESOURCES SDN BHD 2011
67 PEMBAIKAN SALURAN LONGKANG SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2011
68 PIPE LAYING 160MM TOP GLOVE SDN BHD 2011
69 PIPE LAYING 160MM MDS MAJU ENTERPRISE SDN BHD 2011
70 PIPE LAYING 160MM REFFLES VILLA SDN BHD 2012
71 PIPE LAYING & SEWER PIPE 160MM GOLDEN FLIGHT SDN BHD 2012
72 PIPE LAYING 250MM MS PIPE MISA ENGINEERING 2012
73 PEMBAIKAN KEBUK INJAP SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2012
74 MEMASANG PRESSURE REDUCING VALVE SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2012
75 PEMOTONGAN POKOK –POKOK KECIL SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2012
76 BAIKPULIH 1000MM PAIP DI JAMBATAN PULAU INDAH SYARIKAT BEKLAN AIR SELANGOR SDN BHD 2012
77 MENGALIHKAN PILLAR HYDRANT ALAM ENTERPRISE 2012
78 PIPE LAYING 160MM HDPE PIPE ASIA POINT ENGINEERING & ELECTRICAL WORKS SDN BHD 2012
79 MENGALIHKAN PILLAR HYDRANT MANTAP ERAT SDN BHD 2012
80 MEMASANG KEBUK SYARIKAT BEKALNA AIR SELANGOR SDN BHD 2012
81 MEMASANG PRESSURE REDUCING VALVE SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2012
82 PIPE LAYING 150MM DI PIPE JAS TEKNIK 2012
83 PIPE LAYING 150MM MS PIPE FLEXITECH SDN BHD 2012
84 INSTALL 300MM SLUICE VALVE JABATAN KERJA RAYA 2012
85 PIPE LAYING 150MM DI PIPE – SECTION 24, SHAH ALAM JAS TEKNIK 2013
86 PIPE LAYING 63MM HDPE PIPE - BANTING PEJABAT PEMBANGUNAN PERSEKUTUAN NEGERI SELANGOR 2013
87 PIPE LAYING 400MM HDPE PIPE – JALAN YADI, KLANG SRI BINAAN SDN BHD 2013
88 PIPE LAYING 150MM MS PIPE - CHERAS PEMBINAAN SINARAN ANJING SDN BHD 2013
89 PIPE LAYING 160MM HDPE PIPE – KUALA LANGAT FINECONE DEVELOPMENT SDN BHD 2013
90 PIPE LAYING AT ROBSON HEIGHTS KONDO BUKIT ROBSON 2013
91 PIPE LAYING 350MM HDPE PIPE – LEMBAH BERIGIN, HULU SELANGOR TULUS AMAN SDN BHD 2013
92 CADANGAN KERJA PENCUCIAN KOLAM AIR HOWTHORDERN, GOMBAK SYARIKAT BEKLAN AIR SELANGOR SDN BHD 2013
93 CADANGAN KERJA PENCUCIAN KOLAM AIR TANGKI TOK KHALIFA SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2013
94 CADANGAN KERJA PENCUCIAN KOLAM AIR TANGKI BNO, SABAK BERNAM SYARIKAT BEKLAN AIR SELANGOR SDN BHD 2013
95 CADANGAN KERJA PENCUCIAN KOLAM AIR TANGKI SUNGAI NIBONG, SABAK BERNAM SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2013
96 PIPE LAYING 180MM HDPE PIPE AT JALAN HJ MOHD SHARIFF, MERU PEMBINAAN ERA DINAMIK SDN BHD 2013
97 VESSEL TANK REFURBISHMENT – PULAU INDAH PORT KLANG WESTPORTS MALAYSIA SDN BHD 2014
98 DOMESTIC HYDRANT PIPE LEAKAGE – PULAU INDAH, PORT KLANG WESTPORTS MALAYSIA SDN BHD 2014
99 RECTIFY PIPE LEAKAGE AT DBT 1 – PULAU INDAH, PORT KLANG WESTPORTS MALAYSIA SDN BHD 2014
100 PIPE LAYING 400MM MS PIPE (10M) – BATU 3, SHAH ALAM SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2014
101 SUBMERSIBLE WATER PUMP – PULAU INDAH, PORT KLANG WESTPORTS MALAYSIA SDN BHD 2014
102 REPLACEMENT OF JOCKEY PUMP FOR FIRE FIGHTING WESTPORTS MALAYSIA SDN BHD 2014
103 SUPPLY 6” WATER PUMP AT JALAN BANTING, PANDAMARAN MAJLIS PERBANDARAN KLANG 2015
104 SUPPLY 6” WATER PUMP AT TAMAN SENTOSA, KLANG MAJLIS PERBANDARAN KLANG 2015
105 CT3 UNDERGROUND PIPE WORKS WESTPORTS MALAYSIA SDN BHD 2015
106 MILING & PAVING AT CHERAS JAYA TEGUH AMANI SDN BHD 2015
107 MILING & PAVING AT NILAI, NEGERI SEMBILAN TEGUH AMANI SDN BHD 2015
108 PIPE LAYING – 110, 160, 200MM HDPE PIPE AT TELOK PANGLIMA GARANG JI SHENG DEVELOPMENT SDN BHD 2015
109 VESSEL TANK REFURBISHMENT & BY –PASS PIPE AT LBT WESTPORTS MALAYSIA SDN BHD 2015
110 PIPE LAYING – 180MM HDPE PIPE TOP GLOVE SDN BHD (M02) 2015
111 PIPE LAYING – 300, 1050 & 1200MM MS PIPE AT PADANG JAWA, KLANG TEGUH AMANI SDN BHD 2015
112 PIPE LAYING – 150,300 & 450MM MS PIPE AT BUKIT JALIL ALAF MUDA SDN BHD 2015
113 KERJA MEMBEKAL DAN MEMASANG MESIN JENTERA PAM AIR DI JALAN SG BATU 50, TAMAN KLANG UTAMA MAJLIS PERBANDARAN KLANG 2015
114 KERJA MEMBEKAL DAN MEMASANG MESIN JENTERA PAM AIR TAMAN KLANG UTAMA, KLANG UTARA MAJLIS PERBANDARAN KLANG 2016
115 CADANGAN KERJA PENCUCIAN TANGKI MENARA SIJANGKANG (05.M) – KUALA LANGAT SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2016
116 CADANGAN KERJA TURAPAN SEMULA DI KOLAM MENARA TAMAN KEMUNING, BANTING SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2017
117 PEMASANG MS COLLAR BERSAIZ 1000MM - SEPANG SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2017
118 SUPPLY & LAY 150MM MS PIPE – SUBANG JAYA WIDAMAN SDN BHD 2017
119 CADANGAN UNTUK KERJA – KERJA PEMASANGAN BY-PAS BERSAIZ 1200MM X 250MM X 400MM DI JALAN DENGKIL BANTING, BUKIT CHANGGANG – KUALA LANGAT SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2017
120 PROPOSED PIPE SUPPORT REHABILITATION WORKS TO FAILED PIPE SUPPORT AT SG CHINCHANG; SEPANG, SUNGAI KAYU ARA; PETALING & SUNGAU JELOK; HULU LANGAT SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2017
121 PROPOSED PIPE REPLACEMENT PROGRAM IN SELANGOR, WILAYAH PERSEKUTUAN KUALA LUMPUR DAN PUTRJAYA FOR YEAR 2016/2017 – PACKAGE 2A, PETALING ZULFAN (M) SDN BHD 2017
122 PROPOSED FOR SLUICE VALVE REPLACEMENT 1000MM & APPURTENANCES WORKS AT OUTLET 32ML KOTA DAMANSARA RESERVOIR, PETALING SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2017
123 TO SUPPLY & LAY 100MM HDPE PIPE & 63MM HDPE PIPE WESTPORTS MALAYSIA SDN BHD 2017
124 REPAINTING INSRASTRUSTURE PAINTING IN PPR REJANG, SETAPAK KUALA LUMPUR. YOUR PAINTER RESOURCES 2018
125 PIPE WORK AT BRIDGE 19 WESTPORTS MALAYSIA SDN BHD 2018
126 TO FABRICATED 250MM S-BENDAT TELOK GADONG, KLANG BINAAN DEWARAJAN 2018
127 KERJA – KERJA PEMASANG PRV BERSAIZ 200MM DAN KELENGKAPAN DI LORONG HJ ABD MANAN. MERU SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2018
128 CONSTRUCTION OF 1 UNIT OF PERMANENT INSTALLATION (PMI) AT TAMAN DESA KUALA LUMPUR SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2018
129 PROPOSED INSTALLATION OF CONCRETE FOOTING FOR PRESSURE TRANSIENT SYSTEM. SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2018
130 COMMUNICATION PIPE REPLACEMENT PROGRAM C28 : JLN BURUNG SINTAR SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2018
131 COMMUNICATION PIPE REPLACEMENT PROGRAM C32 : JLN BURUNG BAYAN SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2018
132 REPAINTING INSRASTRUSTURE PAINTING IN SRI MULIA APARTMENT, JOHOR BAHARU YOUR PAINTER RESOURCES 2018
133 PROPOSED IMPROVEMENT WORKS FOR KG. NAQSYABANDIAH DISTRIBUTION SYSTEM, HULU LANGAT. SELANGOR. SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2018
134 MEMBINA DAN MENYIAPKAN SATU (1) BUAH TANGKI MENARA KONKRIT BERKAPASITI 2.27ML DI KAWASAN KAMUNTING SERTA KERJA – KERJA BERKAITAN. ATLAS DESIRE SDN BHD 2018
135 UNDER WHARF VESEEL PIPE LEAKING AT DBT 2 WESTPORTS MALAYSIA SDN BHD 2019
136 REPAIR WORKS AT INLET PRESSURE PIPE OF LOGGER SYSTEM AT H.SELANGOR,K.SELANGOR, SABAK BERNAM AND SEPANG (STAGE 1 SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2019
137 DESIGN AND BUILD FOR PROPOSED REHABILITATION OF 600DN PIPE UNDER KESAS HIGHWAY (KEBU INTERCHANGE), KLANG, SELANGOR DARUL EHSAN SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2019
138 PROPOSED 25MM TAPPING POINT INSTALLATION – 23 NOS (QEE3) SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2019
139 PROPOSED COMMUNICATIONS PIPE REPLACEMENT FOR YEAR 2019 PACKAGE C66. KG DELEK 9. KLANG SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2019
140 PROPOSED COMMUNICATIONS PIPE REPLACEMENT FOR YEAR 2019 PACKAGE C67. KG DELEK 10. KLANG SYARIKAT BEKALAN AIR SELANGOR SDN BHD 2019
141 INSTALLATION OF ELECTROMAGNETIC (EM) FLOW METER COMPLETE WITH FITTINGS, CONSTRUCTION OF NEW REINFORCED CONCRETE CHAMBER AND OTHER ASSOCIATED WORKS AT BUKIT TAMPOI RESERVOIR OUTLET PENGURUSAN AIR SELANGOR SDN BHD 2019
142 PROPOSED 25mm TAPPING POINT INSTALLATION - 14 NOS (KLANG AND KUALA LANGAT) PENGURUSAN AIR SELANGOR SDN BHD 2019
143 MILL AND PAVE WORK ACCORDING TO THE DBKL SPECIFICATIONS AT JALAN LOKE YEW (INFORNT SEKOLAH MENENGAH TSUN JIN), KUALA LUMPUR PENGURUSAN AIR SELANGOR SDN BHD 2019
144 COMMUNICATION PIPE REPLACEMENT PROGRAM C32 : JLN BURUNG BAYAN, GOMBAK (MILL & PAVE) PENGURUSAN AIR SELANGOR SDN BHD 2019
145 COMMUNICATION PIPE REPLACEMENT PROGRAM C28 : JLN BURUNG SINTAR, GOMBAK (MILL & PAVE) PENGURUSAN AIR SELANGOR SDN BHD 2019
146 PROPOSED UPGRADING AND DISTRIBUTION WORKS FOR LOW WATER PRESSURE AREAS IN KLANG REGION [SG KANDIS AND JALAN KEBUN AREA] PENGURUSAN AIR SELANGOR SDN BHD 2020
147 PROPOSED PIPE REPLACEMENT PROGRAM IN SELANGOR, WILAYAH PERSEKUTUAN KUALA LUMPUR AND PUTRA JAYA YEAR 2020 PACKAGE 35 – HULU SELANGOR PENGURUSAN AIR SELANGOR SDN BHD 2021
148 PROPOSED PIPE REPLACEMENT PROGRAM IN SELANGOR, WILAYAH PERSEKUTUAN KUALA LUMPUR AND PUTRA JAYA YEAR 2020 PACKAGE 41 - SEPANG PENGURUSAN AIR SELANGOR SDN BHD 2021
149 PROPOSED COMMUNICATION PIPE REPLACEMENT FOR YEAR 2021. PACKAGE C13 – JALAN BUDIMAN, KG TANJUNG SEPAT DARAT, KUALA LANGAT PENGURUSAN AIR SELANGOR SDN BHD 2021
150 PROPOSED COMMUNICATION PIPE REPLACEMENT FOR YEAR 2021 PACKAGE C15 – LOT 3261 AND JALAN KUNTUM. KUALA LANGAT PENGURUSAN AIR SELANGOR SDN BHD 2021
151 PROPOSED COMMUNICATION PIPE REPLACEMENT FOR YEAR 2021 PACKAGE C33 – JALAN DATO HARUN AND JALAN SIDANG MOHD SIDIN, PULAU INDAH KLANG PENGURUSAN AIR SELANGOR SDN BHD 2021
152 PROPOSED PIPE REPLACEMENT PROGRAM IN SELANGOR, WILAYAH PERSEKUTUAN KUALA LUMPUR AND PUTRA JAYA YEAR 2020 PACKAGE 58 - PETALING PENGURUSAN AIR SELANGOR SDN BHD 2021
153 CADANGAN PEMASANGAN PAIP 'INTERCONNECTION' BERSAIZ 700MM DI ANTARA PAIP 1500MM DAN PAIP 1100MM DI KOLAM AIR TERMINAL BANDAR BARU BANGI, WILAYAH HULU LANGAT PENGURUSAN AIR SELANGOR SDN BHD 2022
154 PROPOSED PIPE REPLACEMENT PROGRAM IN SELANGOR, WILAYAH PERSEKUTUAN KUALA LUMPUR AND PUTRAJAYA YEAR 2022 : PACKAGE 64 - HULU SELANGOR. PENGURUSAN AIR SELANGOR SDN BHD 2022
155 PROPOSED COMMUNICATION PIPE REPLACEMENT FOR YEAR 2023 PACKAGE C19 – KAMPUNG HARMONI KIRI JALAN PINGITAN, IJOK (2), KUALA SELANGOR PENGURUSAN AIR SELANGOR SDN BHD 2023
156 REPAIR WORKS OF 400MM DIAMETER TREATED WATER PIPE FOR PULAU KETAM PENGURUSAN AIR SELANGOR SDN BHD 2023