| NO | PROJECTS | CLIENT | YEAR |
|---|---|---|---|
| 1 | 400MM PIPE LAYING - BANTING | MAJU EGGAT (M) SDN BHD | 2006 |
| 2 | INSTALL 150MM BUTERFLY VALVE - PUCHONG | SYARIKAT BINA JAYA SEPAKAT | 2006 |
| 3 | 250MM MS PIPE LAYING – SEC.17 SHAH ALAM | SYARIKAT BINA JAYA SEPAKAT | 2006 |
| 4 | 200MM PIPE LAYING – TANJUNG MALIM, PERAK | PRIMA CORRIDOR SDN BHD | 2006 |
| 5 | 100MM PIPE LAYING | DAYA SAMUDRA SDN BHD | 2006 |
| 6 | 200MM PIPE LAYNG – SABAK BERNAM | CARISSTA SDN BHD | 2006 |
| 7 | 150MM MS PIPE – KEMAMAN, TERENGGANU | PEMBINAAN ISMAIL SDN BHD | 2006 |
| 8 | 100MM & 150MM MS PIPE – PUNCAK ALAM | PEMBINAAN ISMAIL SDN BHD | 2006 |
| 9 | 150MM MS PIPE – WANGSA MAJU | PEMBINAAN JBBS SDN BHD | 2006 |
| 10 | PIPING ANG RELATED WORKS – JALAN SEPADU DBKL | BAN LEE CONSTRUCTION | 2006 |
| 11 | 150MM HDPE PIPE – JALAN HAJI SIRAT | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2006 |
| 12 | WATER TANK | KELAB SULTAN ABDUL AZIZ SHAH | 2006 |
| 13 | SUPPLY & INSTALL METER POINT | SRI RUM PLUMBING | 2006 |
| 14 | TAPPING & LAYING PIPE WATER TANK - SUBANG | DYNAMIC VISION ENTERPRISE | 2006 |
| 15 | 100MM MS PIPE – SUNGAI RASAU | WIDAMAN SDN BHD | 2006 |
| 16 | SUPPLY & INSTALL METER POINT | PABW SDN BHD | 2006 |
| 17 | PIPE LAYING - DENGKIL | PABW SDN BHD | 2006 |
| 18 | 150MM MS PIPE (1000 METER) – TELOK GONG, KLANG | VILLA TECHNO BUILD | 2006 |
| 19 | PIPE LAY OF 80 UNITS HOUSE - RAWANG | CAP CONSTRUCTION SDN BHD | 2006 |
| 20 | 150MM MS PIPE – SEC.32 SHAH ALAM | EXCEL METRO ASSETS SDN BHD | 2006 |
| 21 | 150MM & 500MM DIVERTING PIPE | BINTANG FADRIZAL (M) SDN BHD | 2007 |
| 22 | GROUND WATER TUBEWELL | NISSAN INDUSTRIAL OXYGEN INC | 2007 |
| 23 | HYDRANT PUMP SET | DYNAMIC CONTROL ENGINEERING | 2007 |
| 24 | PEMASANGAN PRV – SECT 13. SHAH ALAM | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2007 |
| 25 | PEMASANGAN PRV – BUKIT KAPAR, KLANG | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2007 |
| 26 | PENGANTIAN FLOAT BALL VALVE – BUKIT LIPAT KAJANG | SYARIAKT BEKALAN AIR SELANGOR SDN BHD | 2007 |
| 27 | 100MM SCOUR VALVE – PORT KLANG | SYARIKAT BEKLAAN AIR SELANGOR SDN BHD | 2007 |
| 28 | 100MM SCOUR VALVE - KAPAR | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2007 |
| 29 | I-CHANNEL PIPE 750MM - DAMANSARA | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2007 |
| 30 | PEMASANGAN PRV – TAMAN MELAWIS | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2007 |
| 31 | PEMASANGAN STRAINER – SECT.7. SHAH ALAM | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2007 |
| 32 | PEMASANGAN INJAP KRITIKAL - KLANG | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2007 |
| 33 | PEMASANGAN PRV – SECT.25, TAMAN SRI MUDA | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2007 |
| 34 | PEMASANGAN & PENGGANTIAN PENUTUP KEBUK - KLANG | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2007 |
| 35 | 150MM & 200MM MS PIPE – BANDAR BOTANIC | SEJATI PLUMBER & TGRADING | 2007 |
| 36 | 250MM MS PIPE – NORTHPORT (M) SDN BHD | MDZ CONSTRUCTION SDN BHD | 2008 |
| 37 | 250MM HDPE PIPE – NORTHPORT (M) SDN BHD | MDZ CONSTRUCTION SDN BHD | 2008 |
| 38 | PENANDA PAIP ABS – PORT KLANG | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2008 |
| 39 | PENANDA PAIP ABS - KAPAR MERU | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2008 |
| 40 | 200MM ALTITUDE VALVE – BUKIT KERAYUNG | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2008 |
| 41 | GREASE INTERSEPTOR SYSTEM | WESTPORTS MALAYSIA SDN BHD | 2008 |
| 42 | REPLACEMENT OF FLOAT BALL VALVE | WESTPORTS MALAYSIA SDN BHD | 2008 |
| 43 | HOSE REEL PIPE LINE | WESTPORTS MALAYSIA SDN BHD | 2008 |
| 44 | 150MM DUCTILE IRON PIPE | WESTPORTS MALAYSIA SDN BHD | 2008 |
| 45 | 150MM MS PIPE | SIVARAJA ENTERPRISE - MARAJITU | 2008 |
| 46 | PEMASANGAN PRV – SUBANG BISTARI | JALUR CAHAYA SDN BHD | 2008 |
| 47 | PEMASANGAN PRV – TERAS JERNANG | JALUR CAHAYA SDN BHD | 2008 |
| 48 | 200MM MS PIPE LAYING – KUALA SAWAH, NEGERI SEMBILAN | JUA YAKIN SDN BHD | 2008 |
| 49 | PENGANTIAN 600MM BUTTERFLY VALVE - KEPONG | MASSIVE SERVICE SDN BHD | 2008 |
| 50 | PEMASANGAN PRV – OLAK LEMPIT, BANTING | HALUAN PRISMA SDN BHD | 2008 |
| 51 | PEMASANGAN PRV - BUKIT RIMAU | HALUAN PRISMA SDN BHD | 2008 |
| 52 | MAIN TRUNK – SUNGAI PANJANG, SABAK BERNAM | HALUAN PRISMA SDN BHD | 2008 |
| 53 | PEMASANGAN PRV – BATU 8, SIJANGKANG | HALUAN PRISMA SDN BHD | 2008 |
| 54 | PIPE LAYING 250MM – JALAN MERU | TOP GLOVE SDN BHD | 2008 |
| 55 | PIPE LAYING 300MM – NORTHPORT | PROTAB CONSTRUCTION SDN BHD | 2010 |
| 56 | ALARM GONG SPRINKLE SYSTEM | WESTPORTS MALAYSIA SDN BHD | 2010 |
| 57 | PIPE LAYING 160MM HDPE PIPE | TOP GLOVE SDN BHD | 2010 |
| 58 | EXTERNAL WALL PAINTING | AKER SOLUTIONS MALAYSIA SDN BHD | 2010 |
| 59 | REVAMP OF WATER TANK | WESTPORTS MALAYSIA SDN BHD | 2010 |
| 60 | UNDERGROUND PIPE LEAKAGE | WESTPORTS MALAYSIA SDN BHD | 2010 |
| 61 | LEAKAGE UNDERGROUND DOMESTICS MAINPIPE | WESTPORTS MALAYSIA SDN BHD | 2010 |
| 62 | PIPE LAYING 160MM | SYARIKAT BINAAN JAYA SEPAKAT | 2010 |
| 63 | PIPE LAYING 250MM | MDZ CONSTRUCTION SDN BHD | 2011 |
| 64 | INTERNAL PLUMBING WORKS | CCF CONSTRUCTION & TRADING SDN BHD | 2011 |
| 65 | LEAKAGE UNDERGROUND & HYDRANT PIPE | WESTPORTS MALAYSIA SDN BHD | 2011 |
| 66 | PIPE LAYING 250MM | AS GLOBAL RESOURCES SDN BHD | 2011 |
| 67 | PEMBAIKAN SALURAN LONGKANG | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2011 |
| 68 | PIPE LAYING 160MM | TOP GLOVE SDN BHD | 2011 |
| 69 | PIPE LAYING 160MM | MDS MAJU ENTERPRISE SDN BHD | 2011 |
| 70 | PIPE LAYING 160MM | REFFLES VILLA SDN BHD | 2012 |
| 71 | PIPE LAYING & SEWER PIPE 160MM | GOLDEN FLIGHT SDN BHD | 2012 |
| 72 | PIPE LAYING 250MM MS PIPE | MISA ENGINEERING | 2012 |
| 73 | PEMBAIKAN KEBUK INJAP | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2012 |
| 74 | MEMASANG PRESSURE REDUCING VALVE | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2012 |
| 75 | PEMOTONGAN POKOK –POKOK KECIL | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2012 |
| 76 | BAIKPULIH 1000MM PAIP DI JAMBATAN PULAU INDAH | SYARIKAT BEKLAN AIR SELANGOR SDN BHD | 2012 |
| 77 | MENGALIHKAN PILLAR HYDRANT | ALAM ENTERPRISE | 2012 |
| 78 | PIPE LAYING 160MM HDPE PIPE | ASIA POINT ENGINEERING & ELECTRICAL WORKS SDN BHD | 2012 |
| 79 | MENGALIHKAN PILLAR HYDRANT | MANTAP ERAT SDN BHD | 2012 |
| 80 | MEMASANG KEBUK | SYARIKAT BEKALNA AIR SELANGOR SDN BHD | 2012 |
| 81 | MEMASANG PRESSURE REDUCING VALVE | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2012 |
| 82 | PIPE LAYING 150MM DI PIPE | JAS TEKNIK | 2012 |
| 83 | PIPE LAYING 150MM MS PIPE | FLEXITECH SDN BHD | 2012 |
| 84 | INSTALL 300MM SLUICE VALVE | JABATAN KERJA RAYA | 2012 |
| 85 | PIPE LAYING 150MM DI PIPE – SECTION 24, SHAH ALAM | JAS TEKNIK | 2013 |
| 86 | PIPE LAYING 63MM HDPE PIPE - BANTING | PEJABAT PEMBANGUNAN PERSEKUTUAN NEGERI SELANGOR | 2013 |
| 87 | PIPE LAYING 400MM HDPE PIPE – JALAN YADI, KLANG | SRI BINAAN SDN BHD | 2013 |
| 88 | PIPE LAYING 150MM MS PIPE - CHERAS | PEMBINAAN SINARAN ANJING SDN BHD | 2013 |
| 89 | PIPE LAYING 160MM HDPE PIPE – KUALA LANGAT | FINECONE DEVELOPMENT SDN BHD | 2013 |
| 90 | PIPE LAYING AT ROBSON HEIGHTS | KONDO BUKIT ROBSON | 2013 |
| 91 | PIPE LAYING 350MM HDPE PIPE – LEMBAH BERIGIN, HULU SELANGOR | TULUS AMAN SDN BHD | 2013 |
| 92 | CADANGAN KERJA PENCUCIAN KOLAM AIR HOWTHORDERN, GOMBAK | SYARIKAT BEKLAN AIR SELANGOR SDN BHD | 2013 |
| 93 | CADANGAN KERJA PENCUCIAN KOLAM AIR TANGKI TOK KHALIFA | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2013 |
| 94 | CADANGAN KERJA PENCUCIAN KOLAM AIR TANGKI BNO, SABAK BERNAM | SYARIKAT BEKLAN AIR SELANGOR SDN BHD | 2013 |
| 95 | CADANGAN KERJA PENCUCIAN KOLAM AIR TANGKI SUNGAI NIBONG, SABAK BERNAM | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2013 |
| 96 | PIPE LAYING 180MM HDPE PIPE AT JALAN HJ MOHD SHARIFF, MERU | PEMBINAAN ERA DINAMIK SDN BHD | 2013 |
| 97 | VESSEL TANK REFURBISHMENT – PULAU INDAH PORT KLANG | WESTPORTS MALAYSIA SDN BHD | 2014 |
| 98 | DOMESTIC HYDRANT PIPE LEAKAGE – PULAU INDAH, PORT KLANG | WESTPORTS MALAYSIA SDN BHD | 2014 |
| 99 | RECTIFY PIPE LEAKAGE AT DBT 1 – PULAU INDAH, PORT KLANG | WESTPORTS MALAYSIA SDN BHD | 2014 |
| 100 | PIPE LAYING 400MM MS PIPE (10M) – BATU 3, SHAH ALAM | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2014 |
| 101 | SUBMERSIBLE WATER PUMP – PULAU INDAH, PORT KLANG | WESTPORTS MALAYSIA SDN BHD | 2014 |
| 102 | REPLACEMENT OF JOCKEY PUMP FOR FIRE FIGHTING | WESTPORTS MALAYSIA SDN BHD | 2014 |
| 103 | SUPPLY 6” WATER PUMP AT JALAN BANTING, PANDAMARAN | MAJLIS PERBANDARAN KLANG | 2015 |
| 104 | SUPPLY 6” WATER PUMP AT TAMAN SENTOSA, KLANG | MAJLIS PERBANDARAN KLANG | 2015 |
| 105 | CT3 UNDERGROUND PIPE WORKS | WESTPORTS MALAYSIA SDN BHD | 2015 |
| 106 | MILING & PAVING AT CHERAS JAYA | TEGUH AMANI SDN BHD | 2015 |
| 107 | MILING & PAVING AT NILAI, NEGERI SEMBILAN | TEGUH AMANI SDN BHD | 2015 |
| 108 | PIPE LAYING – 110, 160, 200MM HDPE PIPE AT TELOK PANGLIMA GARANG | JI SHENG DEVELOPMENT SDN BHD | 2015 |
| 109 | VESSEL TANK REFURBISHMENT & BY –PASS PIPE AT LBT | WESTPORTS MALAYSIA SDN BHD | 2015 |
| 110 | PIPE LAYING – 180MM HDPE PIPE | TOP GLOVE SDN BHD (M02) | 2015 |
| 111 | PIPE LAYING – 300, 1050 & 1200MM MS PIPE AT PADANG JAWA, KLANG | TEGUH AMANI SDN BHD | 2015 |
| 112 | PIPE LAYING – 150,300 & 450MM MS PIPE AT BUKIT JALIL | ALAF MUDA SDN BHD | 2015 |
| 113 | KERJA MEMBEKAL DAN MEMASANG MESIN JENTERA PAM AIR DI JALAN SG BATU 50, TAMAN KLANG UTAMA | MAJLIS PERBANDARAN KLANG | 2015 |
| 114 | KERJA MEMBEKAL DAN MEMASANG MESIN JENTERA PAM AIR TAMAN KLANG UTAMA, KLANG UTARA | MAJLIS PERBANDARAN KLANG | 2016 |
| 115 | CADANGAN KERJA PENCUCIAN TANGKI MENARA SIJANGKANG (05.M) – KUALA LANGAT | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2016 |
| 116 | CADANGAN KERJA TURAPAN SEMULA DI KOLAM MENARA TAMAN KEMUNING, BANTING | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2017 |
| 117 | PEMASANG MS COLLAR BERSAIZ 1000MM - SEPANG | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2017 |
| 118 | SUPPLY & LAY 150MM MS PIPE – SUBANG JAYA | WIDAMAN SDN BHD | 2017 |
| 119 | CADANGAN UNTUK KERJA – KERJA PEMASANGAN BY-PAS BERSAIZ 1200MM X 250MM X 400MM DI JALAN DENGKIL BANTING, BUKIT CHANGGANG – KUALA LANGAT | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2017 |
| 120 | PROPOSED PIPE SUPPORT REHABILITATION WORKS TO FAILED PIPE SUPPORT AT SG CHINCHANG; SEPANG, SUNGAI KAYU ARA; PETALING & SUNGAU JELOK; HULU LANGAT | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2017 |
| 121 | PROPOSED PIPE REPLACEMENT PROGRAM IN SELANGOR, WILAYAH PERSEKUTUAN KUALA LUMPUR DAN PUTRJAYA FOR YEAR 2016/2017 – PACKAGE 2A, PETALING | ZULFAN (M) SDN BHD | 2017 |
| 122 | PROPOSED FOR SLUICE VALVE REPLACEMENT 1000MM & APPURTENANCES WORKS AT OUTLET 32ML KOTA DAMANSARA RESERVOIR, PETALING | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2017 |
| 123 | TO SUPPLY & LAY 100MM HDPE PIPE & 63MM HDPE PIPE | WESTPORTS MALAYSIA SDN BHD | 2017 |
| 124 | REPAINTING INSRASTRUSTURE PAINTING IN PPR REJANG, SETAPAK KUALA LUMPUR. | YOUR PAINTER RESOURCES | 2018 |
| 125 | PIPE WORK AT BRIDGE 19 | WESTPORTS MALAYSIA SDN BHD | 2018 |
| 126 | TO FABRICATED 250MM S-BENDAT TELOK GADONG, KLANG | BINAAN DEWARAJAN | 2018 |
| 127 | KERJA – KERJA PEMASANG PRV BERSAIZ 200MM DAN KELENGKAPAN DI LORONG HJ ABD MANAN. MERU | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2018 |
| 128 | CONSTRUCTION OF 1 UNIT OF PERMANENT INSTALLATION (PMI) AT TAMAN DESA KUALA LUMPUR | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2018 |
| 129 | PROPOSED INSTALLATION OF CONCRETE FOOTING FOR PRESSURE TRANSIENT SYSTEM. | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2018 |
| 130 | COMMUNICATION PIPE REPLACEMENT PROGRAM C28 : JLN BURUNG SINTAR | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2018 |
| 131 | COMMUNICATION PIPE REPLACEMENT PROGRAM C32 : JLN BURUNG BAYAN | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2018 |
| 132 | REPAINTING INSRASTRUSTURE PAINTING IN SRI MULIA APARTMENT, JOHOR BAHARU | YOUR PAINTER RESOURCES | 2018 |
| 133 | PROPOSED IMPROVEMENT WORKS FOR KG. NAQSYABANDIAH DISTRIBUTION SYSTEM, HULU LANGAT. SELANGOR. | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2018 |
| 134 | MEMBINA DAN MENYIAPKAN SATU (1) BUAH TANGKI MENARA KONKRIT BERKAPASITI 2.27ML DI KAWASAN KAMUNTING SERTA KERJA – KERJA BERKAITAN. | ATLAS DESIRE SDN BHD | 2018 |
| 135 | UNDER WHARF VESEEL PIPE LEAKING AT DBT 2 | WESTPORTS MALAYSIA SDN BHD | 2019 |
| 136 | REPAIR WORKS AT INLET PRESSURE PIPE OF LOGGER SYSTEM AT H.SELANGOR,K.SELANGOR, SABAK BERNAM AND SEPANG (STAGE 1 | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2019 |
| 137 | DESIGN AND BUILD FOR PROPOSED REHABILITATION OF 600DN PIPE UNDER KESAS HIGHWAY (KEBU INTERCHANGE), KLANG, SELANGOR DARUL EHSAN | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2019 |
| 138 | PROPOSED 25MM TAPPING POINT INSTALLATION – 23 NOS (QEE3) | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2019 |
| 139 | PROPOSED COMMUNICATIONS PIPE REPLACEMENT FOR YEAR 2019 PACKAGE C66. KG DELEK 9. KLANG | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2019 |
| 140 | PROPOSED COMMUNICATIONS PIPE REPLACEMENT FOR YEAR 2019 PACKAGE C67. KG DELEK 10. KLANG | SYARIKAT BEKALAN AIR SELANGOR SDN BHD | 2019 |
| 141 | INSTALLATION OF ELECTROMAGNETIC (EM) FLOW METER COMPLETE WITH FITTINGS, CONSTRUCTION OF NEW REINFORCED CONCRETE CHAMBER AND OTHER ASSOCIATED WORKS AT BUKIT TAMPOI RESERVOIR OUTLET | PENGURUSAN AIR SELANGOR SDN BHD | 2019 |
| 142 | PROPOSED 25mm TAPPING POINT INSTALLATION - 14 NOS (KLANG AND KUALA LANGAT) | PENGURUSAN AIR SELANGOR SDN BHD | 2019 |
| 143 | MILL AND PAVE WORK ACCORDING TO THE DBKL SPECIFICATIONS AT JALAN LOKE YEW (INFORNT SEKOLAH MENENGAH TSUN JIN), KUALA LUMPUR | PENGURUSAN AIR SELANGOR SDN BHD | 2019 |
| 144 | COMMUNICATION PIPE REPLACEMENT PROGRAM C32 : JLN BURUNG BAYAN, GOMBAK (MILL & PAVE) | PENGURUSAN AIR SELANGOR SDN BHD | 2019 |
| 145 | COMMUNICATION PIPE REPLACEMENT PROGRAM C28 : JLN BURUNG SINTAR, GOMBAK (MILL & PAVE) | PENGURUSAN AIR SELANGOR SDN BHD | 2019 |
| 146 | PROPOSED UPGRADING AND DISTRIBUTION WORKS FOR LOW WATER PRESSURE AREAS IN KLANG REGION [SG KANDIS AND JALAN KEBUN AREA] | PENGURUSAN AIR SELANGOR SDN BHD | 2020 |
| 147 | PROPOSED PIPE REPLACEMENT PROGRAM IN SELANGOR, WILAYAH PERSEKUTUAN KUALA LUMPUR AND PUTRA JAYA YEAR 2020 PACKAGE 35 – HULU SELANGOR | PENGURUSAN AIR SELANGOR SDN BHD | 2021 |
| 148 | PROPOSED PIPE REPLACEMENT PROGRAM IN SELANGOR, WILAYAH PERSEKUTUAN KUALA LUMPUR AND PUTRA JAYA YEAR 2020 PACKAGE 41 - SEPANG | PENGURUSAN AIR SELANGOR SDN BHD | 2021 |
| 149 | PROPOSED COMMUNICATION PIPE REPLACEMENT FOR YEAR 2021. PACKAGE C13 – JALAN BUDIMAN, KG TANJUNG SEPAT DARAT, KUALA LANGAT | PENGURUSAN AIR SELANGOR SDN BHD | 2021 |
| 150 | PROPOSED COMMUNICATION PIPE REPLACEMENT FOR YEAR 2021 PACKAGE C15 – LOT 3261 AND JALAN KUNTUM. KUALA LANGAT | PENGURUSAN AIR SELANGOR SDN BHD | 2021 |
| 151 | PROPOSED COMMUNICATION PIPE REPLACEMENT FOR YEAR 2021 PACKAGE C33 – JALAN DATO HARUN AND JALAN SIDANG MOHD SIDIN, PULAU INDAH KLANG | PENGURUSAN AIR SELANGOR SDN BHD | 2021 |
| 152 | PROPOSED PIPE REPLACEMENT PROGRAM IN SELANGOR, WILAYAH PERSEKUTUAN KUALA LUMPUR AND PUTRA JAYA YEAR 2020 PACKAGE 58 - PETALING | PENGURUSAN AIR SELANGOR SDN BHD | 2021 |
| 153 | CADANGAN PEMASANGAN PAIP 'INTERCONNECTION' BERSAIZ 700MM DI ANTARA PAIP 1500MM DAN PAIP 1100MM DI KOLAM AIR TERMINAL BANDAR BARU BANGI, WILAYAH HULU LANGAT | PENGURUSAN AIR SELANGOR SDN BHD | 2022 |
| 154 | PROPOSED PIPE REPLACEMENT PROGRAM IN SELANGOR, WILAYAH PERSEKUTUAN KUALA LUMPUR AND PUTRAJAYA YEAR 2022 : PACKAGE 64 - HULU SELANGOR. | PENGURUSAN AIR SELANGOR SDN BHD | 2022 |
| 155 | PROPOSED COMMUNICATION PIPE REPLACEMENT FOR YEAR 2023 PACKAGE C19 – KAMPUNG HARMONI KIRI JALAN PINGITAN, IJOK (2), KUALA SELANGOR | PENGURUSAN AIR SELANGOR SDN BHD | 2023 |
| 156 | REPAIR WORKS OF 400MM DIAMETER TREATED WATER PIPE FOR PULAU KETAM | PENGURUSAN AIR SELANGOR SDN BHD | 2023 |